Mustang, OK · Canadian County

EV Charger Installation in Mustang, OK

Installing a Level 2 EV charger in Mustang? We check your panel's spare capacity, run a dedicated 240V circuit to NEC Article 625, and coordinate any needed service upgrade with OG&E.

  • Licensed, bonded & insured
  • OK Lic. #00196169
  • Mustang & OKC metro

EV Chargers quote — Mustang

Tell us about your project and we'll follow up.

What you get in Mustang

  • Panel-capacity and load evaluation before install
  • Dedicated 240V Level 2 circuit (NEC Article 625)
  • Hardwired or NEMA 14-50 plug-in installs
  • Load management when the panel is near capacity
  • Commercial and multi-port charging setups
  • Permits pulled with the City of Mustang and inspections coordinated
  • Service and meter coordination with OG&E when an upgrade is needed

More on this service: EV Charger Installation · All EV Chargers service areas.

EV Chargers FAQs — Mustang

Do you pull electrical permits in Mustang?
Yes. Electrical permits in Mustang (Canadian County) are issued by the City of Mustang. We pull the permit and coordinate inspections so the work is signed off.
Who supplies power in Mustang?
Most of Mustang is served by OG&E, though some addresses fall in a neighboring utility's or electric cooperative's territory. When a job needs a service upgrade or a new meter, we coordinate the work with whichever utility serves your address.
Hardwired or a plug-in outlet?
Both. We install hardwired chargers or a NEMA 14-50 outlet to NEC Article 625, depending on your charger and panel, and recommend what fits best.

Ready to get started?

Talk to a licensed electrician serving Mustang and the OKC metro.

Call NowRequest Service